Technique 1.217 Scrum Change Readiness Assessment
Introduction
A structured assessment to measure how ready an organisation is to execute change using Scrum principles.
Instructions: Rate each statement 1–5, where:
1 = Not true
2 = Slightly true
3 = Moderately true
4 = Mostly true
5 = Fully true
Scoring Statements
A. Leadership Readiness (Product Owner & Sponsorship)
|
Statement |
Score (1–5) |
|
1.1 Leaders clearly articulate the change vision. |
|
|
1.2 A committed Product Owner is identified and available. |
|
|
1.3 Leadership supports iterative delivery. |
|
|
1.4 Leaders empower teams to make decisions. |
|
|
1.5 Leadership understands agile principles. |
Dimension A Score (max 25): ____
B. Team Readiness
|
Statement |
Score (1–5) |
|
2.1 A cross-functional change team exists. |
|
|
2.2 Team members have capacity (10–30% minimum). |
|
|
2.3 Skills required for the change are present. |
|
|
2.4 Team members understand agile ways of working. |
|
|
2.5 Team collaborates well across silos. |
Dimension B Score (max 25): ____
C. Process, Tools & Cadence
|
Statement |
Score (1–5) |
|
3.1 Scrum events (Sprint Planning, Daily Scrum, Reviews, Retros) are feasible. |
|
|
3.2 Collaboration tools exist (boards, chat, video). |
|
|
3.3 Decision-making processes are clear and fast. |
|
|
3.4 Work can be broken into 1–4-week increments. |
|
|
3.5 The organisation is comfortable with inspection and adaptation. |
Dimension C Score (max 25): ____
D. Culture & Mindset Readiness
|
Statement |
Score (1–5) |
|
4.1 Employees are open to experimentation. |
|
|
4.2 Psychological safety exists for team discussions |
|
|
4.3 Failure is seen as an opportunity for learning, not blame. |
|
|
4.4 Transparency and openness are valued. |
|
|
4.5 Change fatigue is manageable. |
Dimension D Score (max 25): ____
E. Stakeholder & User Readiness
|
Statement |
Score (1–5) |
|
5.1 Stakeholders are available for regular Sprint Reviews. |
|
|
5.2 Users are willing to pilot and provide feedback. |
|
|
5.3 Communication channels with users are strong. |
|
|
5.4 Resistance can be identified early and addressed. |
|
|
5.5 There is broad understanding of the change rationale |
Dimension E Score (max 25): ____
Scoring Guide
Total Score = ____ / 125
100–125 = Highly Ready
You can run Scrum-based change effectively. Strong foundation for iterative change and rapid benefits realisation.
80–99 = Moderately Ready
Good environment, but some gaps could slow progress. Strengthen leadership availability, team capacity, or cultural readiness.
60–79 = Low–Moderate Readiness
Scrum will be challenging without preparation.
Address major gaps in roles, mindset, and stakeholder engagement first.
< 60 = Not Ready
Traditional change methods may currently work better.
Focus on building agile capability, leadership alignment and team structure before using Scrum.
(main source: Madel, Monika et al, 2021)